Step 1: Guide sand from the top spout through the first section.
As sand approaches the first movable loop (leftmost), rotate it clockwise (00:01-00:03) to create a path for the sand to flow down and to the right.
Sand flows past the first loop and begins to collect above the subsequent path segment.












